SMP SAMPLING COMMENTS
Page updated: 10/19/2018 7:13
Site Batch SampleStart StartHour SampleDate EndHour SampleCode GearCode Comment
BO2 18279 10/05/2018 0700 10/06/2018 0700 1 GC
BO2 18280 10/06/2018 0700 10/07/2018 0700 1 GC
BO2 18281 10/07/2018 0700 10/08/2018 0700 1 GC
BO2 18282 10/08/2018 0700 10/09/2018 0700 1 GC
BO2 18283 10/09/2018 0700 10/10/2018 0700 1 GC
BO2 18284 10/10/2018 0700 10/11/2018 0700 1 GC
BO2 18285 10/11/2018 0700 10/12/2018 0700 1 GC
BO2 18286 10/12/2018 0700 10/13/2018 0700 1 GC
BO2 18287 10/13/2018 0700 10/14/2018 0700 1 GC
BO2 18288 10/14/2018 0700 10/15/2018 0700 1 GC
BO2 18289 10/15/2018 0700 10/16/2018 0700 1 GC
BO2 18290 10/16/2018 0700 10/17/2018 0700 1 GC
BO2 18291 10/17/2018 0700 10/18/2018 0700 1 GC
LGR 18279 10/05/2018 0700 10/06/2018 0700 1 GC
LGR 18280 10/06/2018 0700 10/07/2018 0700 1 GC
LGR 18281 10/07/2018 0700 10/08/2018 0700 1 GC
LGR 18282 10/08/2018 0700 10/09/2018 0700 1 GC
LGR 18283 10/09/2018 0700 10/10/2018 0700 1 GC
LGR 18284 10/10/2018 0700 10/11/2018 0700 1 GC
LGR 18285 10/11/2018 0700 10/12/2018 0700 1 GC
LGR 18286 10/12/2018 0700 10/13/2018 0700 1 GC
LGR 18287 10/13/2018 0700 10/14/2018 0700 1 GC
LGR 18288 10/14/2018 0700 10/15/2018 0700 1 GC
LGR 18289 10/15/2018 0700 10/16/2018 0700 1 GC
LGR 18290 10/16/2018 0700 10/17/2018 0700 1 GC
LGS 18279 10/05/2018 0700 10/06/2018 0700 1 GC RIVER TEMP 62.8 F.
LGS 18280 10/06/2018 0700 10/07/2018 0700 3 00 NO SAMPLE.  RIVER TEMP 62.6 F. FACILITY IN PRIMARY BYPASS.
LGS 18281 10/07/2018 0700 10/08/2018 0700 3 00 NO SAMPLE; RIVER TEMP 62.4F.
LGS 18282 10/08/2018 0700 10/09/2018 0700 1 GC THE JFF SWITCHED BACK TO PRIMARY BYPASS TODAY AT 0700; LGS SMP SAMPLING EVERY THIRD DAY.RIVER TEMP 62.2F.
LGS 18283 10/09/2018 0700 10/10/2018 0700 3 00 JFF IS OPERATING IN PRIMARY BYPASS; NO SAMPLE. RIVER TEMP 62.0F.
LGS 18284 10/10/2018 0700 10/11/2018 0700 3 00 NO SAMPLE.  RIVER TEMP 61.6 F. FACILITY IN PRIMARY BYPASS.
LGS 18285 10/11/2018 0700 10/12/2018 0700 1 GC RIVER TEMP 61.2 F.  POWERHOUSE OPERATING ON STATION POWER FROM TURBINE UNIT #6.  ALL OTHER UNITS OUT OF SERVICE DUE TO AN ELECTRICAL PROBLEM WITH TURBINE UNIT #1.  ALL ADDITIONAL FLOW IS BEING SPILLED.
LGS 18286 10/12/2018 0700 10/13/2018 0700 3 00 NO SAMPLE. RIVER TEMP 61.2 F.  FACILITY WILL BEGIN COLLECTION FOR TRANSPORT BY TRUCK AT 0701 HOURS ON 10/13.FACILITY IN PRIMARY BYPASS
LGS 18287 10/13/2018 0700 10/14/2018 0700 1 GC RIVER TEMP 60.9 F.  FACILITY RESUMED 24 HOUR COLLECTION FOR TRUCK TRANSPORT AT 0700 HOURS ON 10/13.
LGS 18288 10/14/2018 0700 10/15/2018 0700 1 GC RIVER TEMP 60.8 F.
LGS 18289 10/15/2018 0700 10/16/2018 0700 1 GC JFF AT LGS RESUMED ALTERNATE DAY TRANSPORT BY TRUCK YESTERDAY.RIVER TEMP 60.6F
LGS 18290 10/16/2018 0700 10/17/2018 0700 1 GC RIVER TEMP 60.4 F.
LGS 18291 10/17/2018 0700 10/18/2018 0700 1 GC RIVER TEMP 60.1 F.